A commercial electricity bill can fall or rise for reasons that a monthly kWh total does not reveal. Energy charges concern the amount consumed; demand charges can depend on a measured or calculated peak under the tariff. Read the actual billing definitions before promising that an HVAC energy reduction will produce the same percentage bill reduction.

Identify the tariff and billing boundary

Obtain the customer’s applicable current rate schedule, bill, meter information, and available interval data. Determine whether the meter serves HVAC alone or the whole building. A whole-building demand peak can reflect several loads operating together.

DOE’s utility-rate guidance distinguishes energy, demand, and fixed charges and explains that load magnitude, timing, and tariff structure affect cost. Its rate-review process is written for federal agencies; the actual customer’s utility terms govern a private-site calculation.

Do not infer the tariff from another customer’s bill or a posted average electricity price. Confirm the utility, service class, effective period, time windows, and any other relevant conditions with the responsible utility and financial reviewers.

Understand the demand interval

Demand is expressed as power, commonly kW, under the tariff’s measurement and billing method. It may concern the maximum average over a specified interval rather than an instantaneous display value. The interval and calculation need to come from the actual rate.

As a separate arithmetic illustration, using 8 kWh over a fifteen-minute interval corresponds to an average of 32 kW for that interval: 8 divided by 0.25 hours. This does not establish the interval used by any local utility or mean that 32 kW is the billed demand.

Check whether billing uses particular time-of-use windows, several demand components, a contract minimum, or a look-back rule. A lower peak outside the relevant billing window may not change the charge the customer expects.

Calculate an invented two-part bill

Assume a hypothetical tariff charges $0.10 per kWh and $15 per kW of billed monthly demand. For this example only, assume billed demand equals the stated measured monthly peak, with no time windows, minimum, look-back rule, fixed charge, tax, or other cost.

Invented energy-and-demand comparison
MeasureBeforeAfter
Monthly energy4,000 kWh3,000 kWh
Billed demand in this example12 kW20 kW
Energy charge$400$300
Demand charge$180$300
Included total$580$600

Energy use falls by 1,000 kWh, or 25%, while the included bill increases by $20. The $100 energy-charge reduction is outweighed by a $120 demand-charge increase under the invented tariff.

These are not local rates, a Mar-Hy project, or a prediction of an equipment change. The example isolates the difference between energy and demand billing. A real bill can contain additional components and different rules.

Check whether an earlier peak still affects the bill

DOE’s rate glossary describes demand look-back provisions, sometimes called ratchets, that can use earlier peaks in determining a later billed amount. The exact look-back period, percentage, and applicability must come from the customer’s tariff.

In a separate invented illustration, suppose billed demand is the greater of the current measured peak and 80% of a specified prior peak. A current peak of 20 kW and prior peak of 30 kW would give a comparison of 20 kW with 24 kW. Under this assumed rule, billed demand is 24 kW.

At the earlier invented $15 per kW, that would be $360 rather than $300 for the demand component. This additional example has a different billing rule from the table above. It shows why improving the current measured peak may not immediately produce the expected billed reduction.

Find which loads contributed to the peak

Compare the relevant interval with building operation, weather, occupancy, equipment status, and other major loads. A peak observed after an HVAC project is not automatically caused by the new equipment. Use appropriate measurements and qualified analysis to investigate.

Separate equipment-level performance from the building’s combined load shape. Two efficient loads operating at the same time can contribute to a different peak than the same loads operating at different times, even when their total energy is unchanged.

Do not prescribe a control sequence merely from that observation. Ventilation, process, comfort, equipment, safety, and contractual requirements can limit what may change. The appropriate design and operating team must evaluate any proposed strategy.

Compare costs under consistent assumptions

Keep energy, demand, tariff changes, weather, and occupancy effects separate where the method supports it. A lower bill caused by a rate change is different from a measured reduction in energy use; both can be useful but should be described accurately.

For a proposal, state the model, periods, tariff basis, equipment assumptions, and excluded costs. Include uncertainty and the effect of any applicable billing minimum or look-back provision. A simple monthly peak calculation may not represent the customer’s actual billed demand.

Review the complete installed and operating costs, including any controls, measurement, support, or maintenance needed for the proposed approach. Avoid selling a new device on an unexplained percentage of the current bill.

Use the bill to frame the technical question

Bring the actual load and application question to the qualified project team. If equipment performance or electrical information is needed, ask Mar-Hy for the exact selected model’s documents.

Confirm current utility terms with the utility and appropriate advisers. A useful HVAC proposal explains the equipment’s function and the evidence behind the cost estimate while keeping energy savings and billing outcomes distinct.

PROSTOCK AT MAR-HY

PROSTOCK PROFESSIONAL QUALITY HVAC PARTS AND SUPPLIES

Mar-Hy Prostock HVAC parts and supplies store in Milwaukie

Support for the next service call.

Mar-Hy Distributors adopted the Prostock concept to enhance our support of local HVAC contractors. Since opening our Prostock store, we have received positive feedback from contractors on how they have improved response time to their customers. Our HVAC contractors have been able to stay ahead of the competition with access to our extensive inventory of Prostock Parts.

Quality parts. Contractor support.

Our Prostock replacement parts department is committed to improving the business of our HVAC contractors by providing quality services, competitive pricing, and products and supplies that earn customer trust and build lifetime customer satisfaction. We value our contractors and will continue to provide top of the line service for all of your HVAC needs.