Identify the delivery point, inspection and receiving area, temporary storage, work position, tool location, and removal route. Include the customer and other trades’ access needs, not just the HVAC crew’s preferred path.
Use a simple drawing or the project’s controlled plan. Mark constraints that require qualified assessment, such as access, handling, supports, lifting arrangements, storage conditions, and work-area restrictions. Do not invent universal clearances or load limits from another site’s sketch.
Observe where materials stop or change hands. A pallet delivered near a door may be convenient for unloading but unsuitable for staging if it blocks the work or requires each item to be moved again before installation.