Skip to main content

Call Us: Oregon and SW Washington: (503) 353-0100: Contact Us | Business Hours: 7:00 AM to 5:00 PM Mon-Fri

Business & teams / MAR-HY ARTICLES

Turn HVAC Team Suggestions Into Tested Improvements

Originally published July 16, 2025
Updated November 5, 2026 4 min read

Technicians and office staff notice small problems every day: a missing field in a work order, an unclear parts handoff, or a repeated question that nobody owns. A useful improvement process makes those observations easy to raise, gives someone responsibility for testing a change, and reports what happened.

Ask for a specific observation

Give the team a simple format: what happened, where it happened in the workflow, what information or tool was missing, and what change might help. Ask for an example without unnecessary customer or employee personal information.

“Communication is bad” is difficult to test. “Three of the last five equipment requests omitted the full model, so the counter had to ask again” points to a defined handoff. Check the records before accepting the count as fact, then decide what the example suggests.

Make room for suggestions from dispatch, warehouse, apprentices, experienced technicians, and supervisors. Each sees a different part of the work. A change that helps one person may move the burden to someone else.

Keep safety concerns on their proper path

An improvement list should not become a waiting room for urgent hazards. Maintain the organization’s established route for reporting and addressing safety concerns.

OSHA’s worker-participation guidance emphasizes meaningful input and reporting without retaliation. It also cautions against incentive arrangements that discourage reporting. Avoid judging a team by a low number of reported concerns; silence does not establish that the work is safe.

Technical procedures, equipment modifications, and other controlled work require the appropriate qualified review. Use the suggestion process to surface an issue, not to authorize an improvised field experiment.

Choose a small change with a clear boundary

Start with a reversible workflow change, such as adding a full-model field to a parts request or assigning a named owner to unresolved job questions. Describe who will use it, when the trial begins, and what work is outside the trial.

Ask the people doing the work to review the proposed change before launch. Can the requested information actually be obtained at that point? Is the new field clear? Does another system already contain it?

For an illustrative trial, a service team could test a revised parts-request form for two weeks. The test question is whether requests arrive with the agreed information and whether the form adds an unreasonable burden. It is not a test of whether a new form solves every purchasing problem.

Write a one-page trial record

Suggested record for a workflow improvement
FieldExampleWhy it matters
ProblemRequests often lack agreed equipment identity.Keeps the trial focused on an observable handoff.
ChangeUse a revised request with full-model and unresolved-question fields.Defines what is actually different.
MeasureComplete requests divided by all in-scope requests, with counts retained.Makes the comparison reproducible.
FeedbackRequester and recipient note unclear fields or duplicate entry.Finds burdens the completion rate may miss.
DecisionKeep, revise, extend, or stop at a named review date.Prevents an unfinished trial from becoming permanent by default.

Read the result honestly

Suppose an illustrative baseline has eight complete requests out of 12, and the trial has 14 out of 16. The rates are about 66.7% and 87.5%, a difference of about 20.8 percentage points. Keep the original counts and the definition of “complete.”

Those small samples do not prove the form caused the change. Check whether the job mix, people, or request types differed. Ask whether recipients still needed follow-up and whether requesters found the form workable.

A useful result can be “the field helped, but the instructions were unclear.” Revise that part and test again. There is no need to label every suggestion a success.

Close the loop with the people who contributed

Tell the team what was tested, what was learned, and what will happen next. Explain why a suggestion was deferred or stopped. A named decision and reason are more useful than an overflowing idea list.

If the change is retained, update the actual form or procedure, identify its owner, and include it in training. Remove obsolete versions from the normal workflow so staff are not left choosing between conflicting instructions.

Recognize careful observation, useful questions, and honest reporting. The aim is a team that can improve its work together, with evidence that shows which changes deserve to stay.

PROSTOCK AT MAR-HY

PROSTOCK PROFESSIONAL QUALITY HVAC PARTS AND SUPPLIES

Mar-Hy Prostock HVAC parts and supplies store in Milwaukie

Support for the next service call.

Mar-Hy Distributors adopted the Prostock concept to enhance our support of local HVAC contractors. Since opening our Prostock store, we have received positive feedback from contractors on how they have improved response time to their customers. Our HVAC contractors have been able to stay ahead of the competition with access to our extensive inventory of Prostock Parts.

Quality parts. Contractor support.

Our Prostock replacement parts department is committed to improving the business of our HVAC contractors by providing quality services, competitive pricing, and products and supplies that earn customer trust and build lifetime customer satisfaction. We value our contractors and will continue to provide top of the line service for all of your HVAC needs.