Two proposed measures can interact because they act on the same remaining energy use. In an abstract example, begin with 1,000 units of energy. If one measure reduces that modeled quantity by 10%, 900 units remain. A second 10% reduction applied to the remainder gives 810 units, a total reduction of 19%, not 20%.
This arithmetic is not a prediction for any HVAC measure. Actual interactions can be more complicated: a building-load change can affect equipment sizing, a controls change can affect operating hours, and maintenance can change the baseline against which a replacement is compared.
Ask the person preparing the analysis how combined measures are represented. Avoid adding unrelated brochure percentages and applying the total to the customer’s entire utility bill. Identify the energy uses affected, the baseline, and the sequence of the comparison.
When results are uncertain, show a reasonable range supported by the analysis rather than a precise-looking dollar figure without a defensible basis. Explain which future rates and operating assumptions could change the outcome.